Sort by
Refine Your Search
-
Listed
-
Category
-
Country
-
Program
-
Field
-
, the John Mica Engineering and Aerospace Innovation Complex (MicaPlex), housing several research laboratories (https://erau.edu/research-park/micaplex/labs), a state-of-the-art subsonic wind tunnel
-
member to advance the program. Demonstration of past accomplishments and/or future plans in at least two (2) or more of the “Building on Inclusive Excellence” criteria ( https://fs-diversity.sdsu.edu
-
: Unlocking Net Zero (FIBE3 CDT). Further details can be found at https://www.net-zero-fibe-cdt.eng.cam.ac.uk/ The project is funded in collaboration with M Group, a leading essential infrastructure services
-
- Horticulture Specialist, for field, greenhouse, and high tunnel research projects as well as manage calendars, plan events, and schedule travel for Professors and PAC Superintendent. Additional duties
-
integrate your mathematical models and computational results with their complementary experimental wind-tunnel and water-flume data. Leveraging your strong background in high-fidelity simulations and
-
Delft University of Technology (TU Delft) | Delft, Provincie Zuid-Holland | Netherlands | about 2 months ago
-speed (low-turbulence) wind tunnel and high-speed transonic-supersonic tunnels up to hypersonic flows (Mach 11). A low-speed open test section large wind tunnel (Open Jet Facility) erected in 2008 is
-
Delft University of Technology (TU Delft) | Delft, Provincie Zuid-Holland | Netherlands | 23 days ago
with wind tunnel and field data. A particular focus will be on exploiting the extensive experimental data generated within the HKN project, including measurements from wind-tunnel experiments and full
-
Delft University of Technology (TU Delft) | Delft, Provincie Zuid-Holland | Netherlands | about 2 months ago
-speed (low-turbulence) wind tunnel and high-speed transonic-supersonic tunnels up to hypersonic flows (Mach 11). A low-speed open test section large wind tunnel (Open Jet Facility) erected in 2008 is
-
facilities, you’ll rotate between the “dirty” and “clean” sides of the operation — preparing soiled cages for washing, loading dirty changes into the tunnel washer, unloading the washed cages, and
-
applications such as tunnel linings, arch intrados, and curved bridge soffits. Your profile The candidate should have a Master's degree in Structural Engineering (or related engineering) with a