Sort by
Refine Your Search
-
dissemination is expected to focus on leading Human-Computer Interaction venues. For further information about the project, see: https://dff.dk/en/our-funded-projects/meet-the-researchers/research-leaders
-
ICT, Learning and Organizational Change or the continuing education programme in IT and Learning. Information about the academic content of the programmes is available here: https://www.aau.dk
-
industrial partners. In particular, you will: Develop and validate physics-based, data-driven, or hybrid digital twins of Electrolysis systems, capturing their electrochemical, thermal, flow, and system-level
-
, ethnography, and policy studies. Further description of the project can be found here: https://dff.dk/en/our-funded-projects/meet-the-researchers/research-leaders/eksterne-personer-en/research-leaders-2026
-
part of the PhD programme to gain experience in teaching or other forms of knowledge dissemination related to the student’s PhD project. Accordingly, PhD students contribute to a limited extent to
-
part of the PhD programme to gain experience in teaching or other forms of knowledge dissemination related to the student’s PhD project. Accordingly, PhD students contribute to a limited extent to
-
); contributes to SDC’s master programmes through teaching and guest lectures (Digital Innovation, research methods, computational methods, and case material from the candidate’s own fieldwork); contributes
-
into frontrunner firms in the Danish fashion and textile industry (see https://vbn.aau.dk/da/publications/grøn-omstilling-i-den-danske-mode-og-tekstilindustri-virksomhedsb/ — available in Danish only), the premise
-
At AAU Energy, a position as PhD stipend is available within the general study program. The stipend is open for appointment from 1/9-2026 or soon hereafter. The duration of the position is three
-
SPARK project, starting in September 2026 or soon hereafter. The 3-year project is funded by the EU’s Horizon Europe flagship programme to develop and pilot Stillstrom’s Offshore Power Zone infrastructure