Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
-
Field
-
About the Project PRISM is an ETH Innovedum research and teaching project based at the Chair of Prof. Jan De Vylder (D-ARCH). The project develops AI-assisted tools for architectural drawing
-
The existing 25 design studios for Bachelor and Master students in Architecture present a variety of positions and methods that aim at synthesizing the evolving conditions of the world around us
-
familiar with contemporary construction techniques and have an interest in 20th-century construction techniques or vernacular architecture. Experience in Life Cycle Assessment (LCA), Building Information
-
the cell response. A key innovation in this PhD project is to engineer environmentally (cell)-instructive hydrogels with controlled architecture (pore size, network interconnectivity) and mechanical
-
biology. We are seeking an Optical Systems/Photonics Engineer to design and build light-delivery systems that shape light profiles to control hydrogel architecture. Curious? So are we. We look forward
-
100%, Zurich, fixed-term Design++ is the Center for Augmented Computational Design in Architecture, Engineering and Construction (AEC) at ETH Zurich. The center's vision is to remove collaboration
-
or related software lifecycle/quality standards Experience with hardware-in-the-loop testing and interfacing with sensors/hardware Good knowledge of software architectural patterns Extra meticulous, detail
-
will explore how architecture influences collective contact behavior, aiming to develop design principles. The work will combine physics-based numerical modeling, theoretical reasoning, and concepts from
-
their compatibility with different implant architectures and surface modifications. Evaluate antimicrobial activity: Investigate the ability of nanozyme-coated surfaces to inhibit bacterial growth and biofilm formation
-
100%, Zurich, fixed-term The Department of Architecture (D-ARCH) invites an excellent postdoctoral fellow (18 months, starting 1st January to 1st April 2027 or upon agreement) to take the next step