Sort by
Refine Your Search
-
, visiting researchers, master's students, etc.) Research Context Recent advances in mobile robotics have been driven by remarkable progress in perception, deep learning, and control. However, current robotic
-
to evaluate the predictive value of seismic observations for exploration. Oman—a controlled analogous system The Samail ophiolite is a simplified, well-constrained system where mantle rocks outcrop
-
), IRCER conducts research aimed at understanding and controlling processing routes for ceramics and surface treatments in order to develop materials and components with tailored properties. IMERYS S.A. is a
-
for the development of more predictive preclinical platforms. This PhD project is part of the ANR JCJC EXOFLEX project, which aims to develop an instrumented microfluidic platform capable of simultaneously controlling
-
, physics of fluids, flow control... The main objective is to develop numerical tools to efficiently predict and to deeply understand flows in more and more physically and geometrically complex configurations
-
joint research unit (UMR CNRS 7315) operated by the CNRS and the University of Limoges. Affiliated with the CNRS Institute of Chemistry (INC), IRCER conducts research on the understanding and control
-
to contextualise future observations of Jupiter without an external monitor of solar wind conditions (e.g. the JUICE probe), (iii) making more accurate predictions for exoplanetary radio emissions to aid in
-
at the Laplace laboratory, where numerical and analytical models are being developed to predict plasma potential control and flux entrainment from polarized electrodes. During the third year of the thesis project
-
functional materials. Research activities focus on controlled polymer synthesis, macromolecular engineering, polymer self-assembly, nanoparticle design, and the development of stimuli-responsive polymer
-
methodological comparison between mechanistic vector control models and macroscopic SIR-type models calibrated on serological survey data. Currently, risk indicators (e.g., R₀ estimation) derived from mosquito