-
Informatics Engineering, Industrial Engineering and Management, or Transport Systems, to be duly proven at the time of contracting; or Hold a degree and be enrolled in a non-degree course integrated into
-
well as the smart management of its byproducts, namely water, oxygen, biogas, and nutrients. The work plan for this grant aims to develop a wastewater purification system for electrolysis. The activities include: (i
-
until the time of signing the contract. Activity Outline: Although cities are heterogeneous environments, in the context of e-commerce they have often been regarded as homogeneous entities. The LOG-in
-
testing and validation in controlled and/or real environments; (iv) Participate in the documentation, dissemination, and communication of project results, including the preparation of technical reports