Sort by
Refine Your Search
-
, combining biodiversity surveys, animal movement data, landscape modelling and remote sensing to understand how trees within agricultural landscapes influence wildlife movement and landscape connectivity
-
investigate the wildlife connectivity potential of tree-based agricultural systems, combining biodiversity surveys, animal movement data, landscape modelling and remote sensing to understand how trees within
-
cells with tailor-made error-correcting codes. The successful candidate will combine computational design with laboratory work, developing DNA/RNA systems, molecular circuits, and experimental assays
-
and how disruption of these processes contributes to congenital heart defects. The project will combine state-of-the-art single-nucleus RNA sequencing, spatial gene expression analysis and molecular
-
and how disruption of these processes contributes to congenital heart defects. The project will combine state-of-the-art single-nucleus RNA sequencing, spatial gene expression analysis and molecular
-
design and test enzyme variants, develop biochemical and analytical assays to measure performance, and investigate how combinations of enzymes can work together to maximise plastic depolymerisation
-
within its host, and the molecular and physiological interactions that underpin this unique symbiosis. By combining experimental approaches across engineering biology, the project will provide new insights
-
bacterial proteins that facilitate the acquisition, transport, and integration of REEs into microbial metabolic processes. During this interdisciplinary project, which combines microbiology, structural
-
intensification, dynamic operation, and resource recovery. The project combines modelling, pilot-scale experimentation, and techno-economic assessment to establish MECs as viable unit operations within next
-
hydrological processes (Schumann and Bates, 2018). Within the UK, operational flood mapping by the Environment Agency combines modelling and observations but still relies heavily on precomputed flood risk maps