Sort by
Refine Your Search
-
Category
-
Program
-
Field
-
renewed for a maximum term of one year. Scientific advisor: João Gama Workplace: INESC TEC, Porto, Portugal Maintenance stipend: 601,12, according to the table of monthly maintenance stipend for FCT grants
-
scientific area: COMPUTER SCIENCE,ENGINEERING Scientific subarea: Programming,Informatics Grant duration: 3 months, starting on 2024-07-01 , with the possibility of being renewed for a maximum term of one year
-
INESC TEC is accepting applications to award 1 Scientific Research Grant - HfPT - CBER (AE2024-0180)
SCIENCE,ENGINEERING Scientific subarea: Computer Systems Grant duration: 4 months, starting on 2024-06-17 , with the possibility of being renewed for a maximum term of one year. Scientific advisor: Francesco Renna
-
Scientific subarea: Electrical engineering Grant duration: 4 months, starting on 2024-07-01 , with the possibility of being renewed for a maximum term of one year. Scientific advisor: Jaime Cardoso Workplace
-
. Other supporting documents relevant to the final assessment. Failure to deliver the required documents within the 90-day period after the date of the notice of the conditional awarding of the grant
-
foreigner or non-resident in Portugal - valid until the beginning of the grant. 7. Other supporting documents relevant to the final assessment. Failure to deliver the required documents within the 90-day
-
the required documents within the 90-day period after the date of the notice of the conditional awarding of the grant implies its cancellation. Application period: From 2024-05-29 to 2024-06-12 Submission
-
foreigner or non-resident in Portugal - valid until the beginning of the grant. 7. Other supporting documents relevant to the final assessment. Failure to deliver the required documents within the 90-day
-
- valid until the beginning of the grant. 7. Other supporting documents relevant to the final assessment. Failure to deliver the required documents within the 90-day period after the date of the notice
-
- valid until the beginning of the grant. 5. Other supporting documents relevant to the final assessment. Failure to deliver the required documents within the 90-day period after the date of the notice