Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
framed and financed under the Recovery and Resilience Plan of Portugal Workplan: The work plan is part of WP5 – (Centros de Produção Híbrida para a Indústria Metalomecânica) of the PRODUTECH R3 Agenda
-
framed and financed under the Recovery and Resilience Plan of Portugal Workplan: The work plan is part of WP2 - DESIGN.2. TRANSFORM- of the PRODUTECH R3 Agenda (Recovery-Resilience-Reindustrialisation
-
/C05-i01/2022 framed and financed under the Recovery and Resilience Plan of Portugal Workplan: The work plan is part of WP9 – SmartIL- of the PRODUTECH R3 Agenda (Recovery-Resilience-Reindustrialisation
-
framed and financed under the Recovery and Resilience Plan of Portugal Workplan: The work plan is part of WP9 – SmartIL- of the PRODUTECH R3 Agenda (Recovery-Resilience-Reindustrialisation). This work plan
-
plan includes: (1) Support in the preparation of numerical models; (2) Conducting parametric studies on the seismic behaviour of precast concrete structures with mechanical connections; (3) Processing
-
well as the purchasing process of materials and services required for the development of the project according to plan. Duration: The research fellowship will have a duration of 12 months. It’s expected to begin in March
-
Recuperação e Resiliência (PRR-IAPMEI Workplan: The work plan includes: (1) Quality control system through computer vision; (2) Calibration and validation of quality control; (3) Monitoring of laboratory tests