-
Diseases: implementation of the relational database; design and implementation of the GUI; implementation of the application logic that connects the GUI with the database; secure authentication and data
-
funded by Recovery and Resilience Plan (RRP) https://recuperarportugal.gov.pt/ and by european funds Next Generation EU, under the following conditions: 2 | DURATION FOUR (4) months, starting in
-
conducted in the context of Activities “Instrumentation and Fault Injection" and “Multi-threading support”. The work plan includes studying existing target systems, tools and libraries, designing mechanisms
-
innovations that can be extrapolated for general-purpose acceleration. - Definition and application of design space exploration methods to identify several architecture configurations and topologies
-
the scope of project PT Smart Retail – Refª C6632206063-00466847, funded by Recovery and Resilience Plan (RRP) https://recuperarportugal.gov.pt/ and by european funds Next Generation EU, under
-
-00000008 funded by funded by the Recovery and Resilience Plan (RRP) and Next Generation EU European Funds Application submission from May 13 to 24 of 2024 WHO WE ARE INESC-ID (www.inesc-id.pt ), “Instituto
-
by Recovery and Resilience Plan (RRP) https://recuperarportugal.gov.pt/ and by european funds Next Generation EU, under the following conditions: 2 | DURATION THREE (3) months, starting in June 2024
-
funded by Recovery and Resilience Plan (RRP) https://recuperarportugal.gov.pt/ and by european funds Next Generation EU, under the following conditions: 2 | DURATION TWELVE (12) months, starting in June
-
and Resilience Plan (RRP) https://recuperarportugal.gov.pt/ and by european funds Next Generation EU, under the following conditions: 2 | DURATION SIX (6) months, starting in May 2024
-
-00454142 , funded by Recovery and Resilience Plan (RRP) https://recuperarportugal.gov.pt/ and by european funds Next Generation EU, under the following conditions: 2 | DURATION SIX (6) months, starting in