Sort by
Refine Your Search
-
) group, Nuclear Structure & Advanced Technologies Section, Physics Division, Physical Sciences Directorate, at Oak Ridge National Laboratory (ORNL). ADADS draws from fundamental physics to develop
-
of experience in gas detection and control systems Experience with experimental, custom laboratory equipment construction and implementation Supervision of crafts in a bargaining unit environment Preferred
-
well as electromagnetic, structural and thermal FEA programs (i.e. MagNet, Motor CAD, ANSYS and COMSOL) Capable of carrying designs through to prototype build and test. Be cognizant and knowledgeable about motor drive
-
executing structured, technical projects Preferred Qualifications: An MS in mechanical engineering, nuclear engineering, civil engineering, engineering science, or a related discipline Experience with neutron
-
and extreme environment structural materials. A strong background in mechanical behavior of materials is required. Demonstrated experience in the implementation of nonlinear constitutive models in
-
with engineering integrity and structured configuration management. Gloveboxes are typically used as an engineering control to protect workers from hazards and to control the atmosphere for work with air
-
cycle phases, institutional controls, and construction or facilities project environments. Ability to hold and maintain a DOE security clearance is required. Relocation: Moving can be overwhelming and
-
, PPPL, and SRNL) within the DOE Office of Science. The project supports the construction of the international ITER fusion facility (www.iter.org ), a partnership among seven members—China, Europe, India
-
, laboratory, or facility electrical systems. Experience supporting electrical design and construction projects. Knowledge of power distribution systems and power electronics. Experience troubleshooting
-
projects in the National Security Sciences Directorate, including: Project work breakdown structure (WBS) and dictionary Summary and detailed, logic driven, resource loaded schedules Summary and detailed