-
sector leading projects with the construction of the Design and Digital Arts building which will open in 2024. Recent developments at our Clifton campus include a £23m Medical Technology Innovation
-
About the Role Our Costume Design & Construction BA (Hons) course sits within the Design for Performance subject area, which is part of the Design & Digital Arts Department within the Nottingham
-
sector leading projects with the construction of the Design and Digital Arts building which will open in 2024. Recent developments at our Clifton campus include a £23m Medical Technology Innovation
-
of the priorities of the Centre for Sustainable Construction and Retrofit (CSCR) and the specific interests and experience of the successful candidates. The common objective of the research team is to conduct high
-
sector leading projects with the construction of the Design and Digital Arts building which will open in 2024. Recent developments at our Clifton campus include a £23m Medical Technology Innovation
-
sector leading projects with the construction of the Design and Digital Arts building which will open in 2024. Recent developments at our Clifton campus include a £23m Medical Technology Innovation
-
sector leading projects with the construction of the Design and Digital Arts building which will open in 2024. Recent developments at our Clifton campus include a £23m Medical Technology Innovation
-
an innovative approach to treatment of Alzheimer’s disease. This PhD studentship will study the potential link between the microbiota and Alzheimer’s disease. The gut microbiota forms biofilm structures where
-
structures to direct the formation of novel mesoscale composites. The interdisciplinary project includes aspects of microbiology, bio-engineering, biochemical analysis and materials chemistry. The project will