Sort by
Refine Your Search
-
Listed
-
Category
-
Country
-
Program
-
Field
-
effectively within the Hospitality Administration functions of the Lab Resources area, Courses Restaurant, Bakery Café, or Courses Catering. To meet the Ivy Tech Program guidelines and procedures for handling
-
are variable and scheduled as needed based upon internal and external event rentals. Is this a work study job? No VP Area Academic Affairs Department 00073 - Utah Museum of Fine Arts Location Campus City Salt
-
individual and/or collaborative research in the area of material chemistry (e.g., corrosion inhibitor, coatings, batteries, supercapacitors, etc) and regularly disseminate and explain research findings through
-
Framework Programme? Horizon Europe - ERC Reference Number 2026/CP/218 Is the Job related to staff position within a Research Infrastructure? No Offer Description Research Area*: 029 (Determination
-
- Entry Level Pro FLSA Code Professional Patient Sensitive Job Code? No Standard Hours per Week 40 Full Time or Part Time? Full Time Shift Day Work Schedule Summary Monday-Friday, 8am-5pm VP Area Academic
-
maintains linen room in clean and orderly condition. Collects soiled linens throughout campus and support locations. Supplies clean and collect soiled scrubs / coats from scrubEx unit and program units
-
. This person must be able to work in multiple locations within the NYC metro area and be able to accommodate varying work shifts. Work Schedule: Sunday - Wednesday 8 am-5 pm, Thursday 8 am-1:30 pm Position
-
, encompassing interdisciplinary studies aimed at optimizing nanomaterials fabrication processes, surface physicochemistry, material modifications (either in bulk or at surface region, including
-
of the annual events or programs • Oversee white coat ceremony and assist with other events related to student activities, i.e. orientation / blue coat ceremony, new student day, commencement • Implement changes
-
surfaces for DePaul buildings, fixtures, and equipment, including but not limited to doors, walls, ceilings, windows, floors, concrete, and mechanical equipment. All work will be performed in accordance with