Sort by
Refine Your Search
-
Category
-
Program
-
program - art. 6º, n.4 b) https://www.fct.pt/wp-content/uploads/2026/01/RBi_Republicado_2025.pdf subject to suitable performance within the period of the project, not exceeding the maximum period set by FCT
-
of the fellowship contract that the selected candidate presents a single copy of the official diploma recognition, required in education level For more information about diploma recognition: https://www.dges.gov.pt
-
Deadline 21 Sep 2026 - 23:59 (Europe/Lisbon) Country Portugal Type of Contract Temporary Job Status Full-time Is the job funded through the EU Research Framework Programme? Not funded by a EU programme
-
for such grants. RENEWALL Renewable is subject to performance if the candidate is enrolled in a MSc program - art. 6º, n.4 b) https://www.fct.pt/wp-content/uploads/2026/01/RBi_Republicado_2025.pdf subject to
-
8 Sep 2026 Job Information Organisation/Company INESC ID Research Field Engineering » Computer engineering Engineering » Other Researcher Profile First Stage Researcher (R1) Positions PhD Positions
-
protection systems. Real-time simulation of centralized protection control (CPC) systems. BINDING LEGISLATION Law 40/2004 of 18th of August (Scientific Research Fellow Status) in its current wording. https
-
is subject to performance if the candidate is enrolled in a MSc program - art. 6º, n.4 b) https://www.fct.pt/wp-content/uploads/2026/01/RBi_Republicado_2025.pdf subject to suitable performance within
-
project, not exceeding the maximum period set by FCT for such grants. RENEWALL Renewable is subject to performance if the candidate is enrolled in a PhD program - art. 6º, n.4 c) https://www.fct.pt/wp
-
) Country Portugal Type of Contract Permanent Job Status Full-time Is the job funded through the EU Research Framework Programme? Horizon Europe (other) Is the Job related to staff position within a Research
-
if the candidate is enrolled in a: PhD program - art. 6º, n.4 c) https://www.fct.pt/wp-content/uploads/2026/01/RBi_Republicado_2025.pdf subject to suitable performance within the period of the project, not exceeding