Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
well as in conducting non-linear structural analyses. This work will serve as a basis for developing fragility functions for existing racks and performing comprehensive seismic risk and loss estimation
-
duration of 4 months, with the predicted starting date in October 2026, on an exclusive basis, eventually renewable, but never exceeding the end of the project. If it is not possible to ensure the duration
-
Manuel Milheiro de Oliveira Pinto Soares. Grant duration: Initial duration of 12 months, with the predicted starting date in october 2026, on an exclusive basis eventually renewable but never exceeding
-
, on an exclusive basis, eventually renewable, but never exceeding the end of the project. The eventual renewal of the scholarship will be carried out as determined in article 5º of the Research Grants Regulation
-
the predicted starting date in October 2026, on an exclusive basis, eventually renewable but never exceeding the end of the project. The eventual renewal of the scholarship will be carried out as determined in
-
within the framework of project “AGRO-CIRN - Circular Agroecosystems: new approach to soil health in the north region”, with operation code at the Funds Platform (Balcão dos Fundos) NORTE2030-FEDER
-
and FCT code. 2023.18225.ICDT and e DOI https://doi.org/10.54499/2023.18255.ICDT , funded by COMPETE 2030 by Portugal 2030, and by the European Union financial support from national funds/OE through
-
, on an exclusive basis, eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 12 months estimated in the previous paragraph, this duration will be adjusted
-
Dzmitry Ivanou. Grant duration: Initial duration of 6 months, with the predicted starting date in September 2026, on an exclusive basis eventually renewable but never exceeding the project duration. If it
-
supervision of Doctor Anabela Borges. Grant duration: Initial duration of 6 months, with the predicted starting date in September 2026, on an exclusive basis, eventually renewable but never exceeding