Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
Silva and Doctor Vítor Jorge Pais Vilar. Grant duration: Initial duration of 06 months, with the predicted starting date in September 2026, on an exclusive basis, eventually renewable but never exceeding
-
Vilar. Grant duration: Initial duration of 6 months, with the predicted starting date in September 2026, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not
-
September 2026, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph
-
Grant within the framework of the Funding UID/50020/2025 of the of the Research Unit LSRE-LCM – Laboratory of Separation and Reaction Processes – Laboratory of Catalysis and Materials, and DOI https
-
the contract. Activity Outline: This work comprises the laboratory characterization of mixtures of steel slags, ground rubber from end-of-life tires, and natural aggregates. In the mixture characterisation
-
, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph, this duration will be adjusted
-
Manuel Magalhães de Andrade Gonçalves and Rui Pedro Ferreira Pinto. Grant duration: Initial duration of 3 months, with the predicted starting date in August 2026, on an exclusive basis eventually renewable
-
starting date in August 2026, on an exclusive basis, eventually renewable but never exceeding the project duration. If the contracting procedures do not allow the scholarship to have a minimum duration of 3
-
months, with the predicted starting date in July 2026, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 12 months
-
, on an exclusive basis, eventually renewable but never exceeding the end of the project. If the 5-month duration cannot be guaranteed, it will be adjusted to the project’s end date, provided that the minimum