Sort by
Refine Your Search
-
contract will be for 12 months with an extension for the following 36 months contingent on performance and compatibility. You are expected to work in Leiden and the appointment must lead to the completion
-
based on recycled scrap and direct reduced iron (DRI/HBI). Ensuring sufficient availability of high-quality feedstocks for these production routes is a key challenge, as future demand will increasingly
-
–basic oxygen furnace (BF-BOF) steelmaking with lower-carbon electric arc furnace (EAF) production based on recycled scrap and direct reduced iron (DRI/HBI). Ensuring sufficient availability of high
-
the center of the city of Leiden The starting date is between 1 December 2026 and 1 February (or as soon as possible thereafter). You are expected to work in Leiden and the appointment must lead to the