Sort by
Refine Your Search
-
time of six months, possibly renewable up to a maximum of 12 months, both scheduled to start on June/2024. 2. WORK PLAN AND WORKPLACE: Scholarship 1 The activities to be carried out, in collaboration
-
maximum duration of 12 months . 2. WORK PLAN AND WORKPLACE: The work to be carried out follows directly from the work plan of the project mentioned above, including, in particular, the development
-
last up to a maximum of 12 months, scheduled to start on May 2024. 2. WORK PLAN AND WORKPLACE: Preparation of samples for the development of SAP; screening and separation by particle size; chemical
Searches related to urban design
Enter an email to receive alerts for urban-design positions