Sort by
Refine Your Search
-
Listed
-
Field
-
Selection process Full announcement also available to FEUP - FEUP| Bolsa de investigação |FEUP-SAVERACK-EST2-BOLS-FEUP-26-46 Applications must be submitted via the online application system available at https
-
and FCT code. 2023.18225.ICDT and e DOI https://doi.org/10.54499/2023.18255.ICDT , funded by COMPETE 2030 by Portugal 2030, and by the European Union financial support from national funds/OE through
-
developed at the LEPABE - Laboratory for Process Engineering, Environment, Biotechnology and Energy, Department of Chemical and Biological Engineering of the Faculty of Engineering of the University of Porto
-
Grant within the framework of the Funding UID/50020/2025 of the of the Research Unit LSRE-LCM – Laboratory of Separation and Reaction Processes – Laboratory of Catalysis and Materials, and DOI https
-
carried out at the Department of Industrial Engineering and Management of the Faculty of Engineering of the University of Porto, under the scientific supervision of Professor Marta Campos Ferreira and
-
Intelligent Industry research lab (DIGI2), of the Systems and Technologies Research Centre (SYSTEC) of the Faculty of Engineering of the University of Porto, under the scientific supervision of Professors Gil
-
the University of Porto, under the scientific supervision of Professor Gil Manuel Magalhães de Andrade Gonçalves and Doctor Eliseu Moura Pereira. Grant duration: Initial duration of 3 months, with the predicted
-
for a research grant within the framework of the Funding UID/00511/2025 of the Research Unit LEPABE - Laboratory for Process Engineering, Environment, Biotechnology and Energy, and DOI https://doi.org
-
at https://www.apply.up.pt (Ref. NUTRILIX-BM-MEMBRANEDISTILLATION -BOLS-FEUP-26-17) Selection process Full announcement also available at FEUP - FEUP| 1 Bolsa de investigação |NUTRILIX-BM
-
of Civil Engineering of the Faculty of Engineering of the University of Porto (FEUP), under the scientific supervision of Professor Sara Rios da Rocha e Silva. Grant duration: Initial duration of 6 months