Sort by
Refine Your Search
-
; iv) mixture optimization (task 2). Beyond laboratory activities, the scholarship holder will follow the construction of the experimental road section (task 4), in the life cycle analysis (task 5), and
-
signing the contract. Activity Outline: The activities to be carried out fall within the field of waste and by-product valorization and their use in 3D printing construction technology, contributing
Searches related to construction
Enter an email to receive alerts for construction positions