Sort by
Refine Your Search
-
– up to 1.5 points; No – 0 points; iii. Attendance of courses in the area of computer simulation of the hygrothermal behaviour of building components and/or energy efficiency of buildings: Yes – up
-
travel behavior in (sub)urban areas. The project aims to ENHANCE sustainable travel in small cities and outer metropolitan areas and takes a closer look at the 15-minute city concept. The ENHANCE project
-
to 5 points Good knowledge and good motivation - 2 to 3 points Lack of knowledge or motivation - 0 to 1 points I-C2 - Attitude (evaluates the applicant's behaviour in terms of teamwork skills, conflict
-
motivation - 4 to 5 points Good knowledge and good motivation - 2 to 3 points Lack of knowledge or motivation - 0 to 1 points I-C2 - Attitude (evaluates the applicant's behaviour in terms of teamwork skills
-
of behavior (doi: 10.3389/fncel.2021.639322), electrophysiology (doi: 10.1111/jnc.14816), energy charge (by HPLC), redox status (colorimetry), mitochondria function (Sea Horse) and mitochondria biogenesis
-
Cognitive and Behavioral Intervention (CINEICC). The call is governed by this Notice of Opening, the University of Coimbra Research Grant Regulations (RBI-UC), subsidiarily by the Research Grant Regulations
-
the main objectives are: i) evaluation of the resilient and long-term permanent deformation cyclic behaviour; ii) evaluation of quality control parameters; iii) constitutive modelling geotechnical parameters
-
calculated as the weighted average of the criteria listed above. In the event of a tie between candidates, the selection panel may conduct an interview for tie-breaking purposes. The interview will focus
-
of 30%, and relevant previous experience, with a weighting of 70%. If necessary, the jury will conduct an interview with a maximum of 5 candidates who, after analysis of the first components, are
-
structural system. Activity A2 – Characterization of the Physical and Structural System and Demonstration Project. Objectives: (i) conduct structural and functional testing; (ii) develop a BIM-based