5 Electrical Engineering positions at University of Groningen in Netherland in Netherlands
-
, the development of robust catalytic systems for green processes in water marks one of the current challenges of the chemical industry. Achieving more ambitious sustainability goals necessitates a gradual transition
-
the modularity of phosphoramidite building blocks, offers a vast chemical space for potential ligands. Furthermore, the development of robust catalytic systems for green processes in water marks one of the current
-
PhD positions: Artificial Design of Phosphoramidites for Asymmetric Catalysis in Water (2 x 1.0 FTE)
, the development of robust catalytic systems for green processes in water marks one of the current challenges of the chemical industry. Achieving more ambitious sustainability goals necessitates a gradual transition
-
1,833GW by 2050 (DNV, 2022), which represents a 30-fold increase compared to the current situation. Also, The Netherlands set the goal of deploying 150GW of offshore wind power in the North Sea alone, with
-
increase compared to the current situation. Also, The Netherlands set the goal of deploying 150GW of offshore wind power in the North Sea alone, with 70GW targeted for the Dutch part (Klimaatakkoord, 2019