Sort by
Refine Your Search
-
) for transforming a decommissioned lignite-fired power plant and an abandoned mine into a Large-Scale Long-Duration Energy Storage (LDES) facility. Initially, existing mathematical and simulation models
-
Communication (ISAC) using cellular infrastructure is expected to introduce an additional sensing capability for future vehicular systems. This capability can complement conventional vehicle-based sensing and
-
seeks to appoint a Researcher (R1- Master's Degree) on information management who can generate insights and recommendations based on process and user feedback data analysis to contribute
-
: The main aspects of the project include studying a new rule and its role in physiology based on the recently published concept of the “coregulons” that can be built by proteins/RNAs in condensates
-
: The main aspects of the project include studying a new rule and its role in physiology based on the recently published concept of the “coregulons” that can be built by proteins/RNAs in condensates. The PhDs