2 control-engineering positions at GSI Helmholtzzentrum für Schwerionenforschung in Germany
-
systems being served by the Data Acquisition System attached to tiered storage and an associated controls framework based on EPICS. The reaction setup in a nuclear physics context requires picosecond timing
-
the following four teams and areas of responsibility: Team-1 FSB Controlling / RM Finance / Total Cost Overviews / Auditing Cost controlling, taking into account all cost-relevant processes Creating total cost
Searches related to control engineering
Enter an email to receive alerts for control-engineering positions