Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
(https://centreforlunghealth.ca/ ). The Centre benefits from additional support and common goals through the following at UBC: the Data Sciences and Health Research Cluster, the Data Science Institute
-
temporary position in the McGill Engine Centre (https://www.mcgill.ca/engine/ ), with the possibility of renewal. Full-time presence on site is required in a shared workspace. No work from home is possible
-
syllabus for this class which must follow the template provided by the McGill Course Outline Guidelines (https://www.mcgill.ca/tls/instructors/course-design/outline ) Before applying, please note that to
-
information for three references. All materials must be submitted online at: https://ubc.wd10.myworkdayjobs.com/ubcfacultyjobs . Review of applications will begin July 13, 2026. All applications received by
-
. You are covered by the working conditions specified in the McGill Course Lecturers and Instructors Union (MCLIU) collective agreement: https://www.mcgill.ca/hr/employee-relations/assocs-unions . Before
-
McGill University | Edmonton West University Strathcona Place, Alberta | Canada | about 2 months ago
priority Job Posting, please make sure you meet the eligibility requirements (http://www.mcgill.ca/studentaid/work-study/students ) for the current academic year. Hiring Unit: Schulich School of Music
-
process. You need to complete the following form to complete your application: https://forms.cloud.microsoft/r/T4BzcDfPdS . Mandatory Information Training Session (Virtual): Week of July 27, 2026 (Day
-
Date Posted: 07/06/2026 Req ID: 49221 Faculty/Division: Faculty of Architecture,Landscape&Design Department: Daniels Faculty of Arch., Land & Design Campus: St. George (Downtown Toronto) Description
-
Haudenosaunee peoples. Our main campus is situated on the Haldimand Tract, the land granted to the Six Nations that includes six miles on each side of the Grand River. Our active work toward reconciliation takes
-
Hospital, National Research Council, and others. The total building area is 8.1 million square feet (754,000 square meters) across 766 hectares of land. The Facilities team is comprised of over 300 trades