-
. 9.4 In the evaluation of the dimensions of the aspects described in 9.1, the following parameters are considered, and the following weighting factors are attributed: A1) Criteria for evaluating
-
of 4 months estimated in the previous paragraph, this duration will be adjusted according to the end date of the project, and provided that the minimum duration of 3 consecutive months is guaranteed, in
Searches related to parameter estimation
Enter an email to receive alerts for parameter-estimation positions