Sort by
Refine Your Search
-
Category
-
Program
-
Field
-
of an innovative numerical model to assess the theoretical impact of a DTIS in lightweight modular facades for decreasing overheating. WP3 – Geometric optimization: Definition of a new geometric configuration for
-
real-time optimization algorithm for a simulated moving bed system to correct possible mismatches between the mathematical model and the real process. The approach to be developed is based on modifier
-
crystallization studies for the recovery of ammonia or ammonium from landfill leachates using an oscillatory flow reactor (OFR). Accordingly, the work plan will focus on optimizing the continuous precipitation
-
project work: Preparation and optimization of perovskite solar cells for use under artificial light conditions; Photovoltaic characterization of solar cells under standard conditions of indoor light
-
such as Optical Coherence Tomography (OCT) and Confocal Microscopy, determination of colony-forming units, among others; 3) design and optimization of FISH protocols using nucleic acid mimics (NAMs
-
for process optimization. (1 to 5 points). D. Motivation letter that will allow to evaluate the English proficiency and motivation of the candidate (1 to 5 points) After reviewing the submitted documentation
-
Research Grant within the scope of the project “OUROMOVE - Ubiquitous and Robust Optimization for Fleet Operations and Rostering”, with nr. 17403 and operation code at the Funds Platform (Balcão dos Fundos
-
systems for process optimization. (1 to 5 points). D. Motivation letter that will allow to evaluate the English proficiency and motivation of the candidate (1 to 5 points) After reviewing the submitted
-
on optimizing the continuous precipitation/crystallization of ammonia or ammonium from leachates using a laboratory-scale OFR. During the work, the influence of several variables controlling ammonia or ammonium
-
, namely: needs diagnosis and assessment; development of artificial intelligence-based forecasting models; and development of optimal control models. Relevant experience directly in the project’s area – 5