The page you are requesting does not exist. You can start your search here!
Sort by
Refine Your Search
-
the main objectives are: i) evaluation of the resilient and long-term permanent deformation cyclic behaviour; ii) evaluation of quality control parameters; iii) constitutive modelling geotechnical parameters
-
Filipe Ribeiro Pinto de Oliveira Azevedo. Grant duration: Initial duration of 3 months, with the predicted starting date in September 2026, on an exclusive basis eventually renewable but never exceeding
Searches related to model predictive control
Enter an email to receive alerts for model-predictive-control positions