Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
-
Field
-
the end of the grant contract, as stipulated in Article 7 of the RBI-UC, subject to an opinion issued by the respective supervisor(s). The report models, performance evaluation criteria, and the grant
-
an emphasis on: High-temperature processing of metals and oxides for microstructural control; Microstructural and mechanical characterization of the materials developed and processed; Participation in outreach
-
the end of the grant contract, as stipulated in Article 7 of the RBI-UC, subject to an opinion issued by the respective supervisor(s). The report models, performance evaluation criteria, and the grant
Searches related to model predicative control
Enter an email to receive alerts for model-predicative-control positions