Sort by
Refine Your Search
-
& Interoperability – and more specifically, in the following tasks: Task 4.1: Ontology Definition, Alignment and Formalization (CIDOC-CRM & INSPIRE), focusing on the design and extension of the MNEME semantic model
-
the following work packages: WP2: Urban Digital Twin, Data Services and Security and, more specifically, in the following task: Task 2.1: Common Information Models and Urban Data Spaces The task focuses
-
) for transforming a decommissioned lignite-fired power plant and an abandoned mine into a Large-Scale Long-Duration Energy Storage (LDES) facility. Initially, existing mathematical and simulation models
-
on validating the holistic methodology for transforming decommissioned power plants and mining sites into high-capacity energy storage solutions. Specifically, comprehensive simulations of the storage models and
-
vehicular communication and perception performance. The methodological focus will be on simulation-based evaluation, analytical modelling, and synthetic data generation. Radar and other sensing modalities