-
the performance of the heavy-ion accelerators of RIKEN RI Beam Factory. The successful candidate is expected to be in charge of accelerator operation and maintenance at F-REI in future. Assignments and jobs will be
-
at the latest. 2.RIKEN may adjust the above maximum period of renewability based on a) the employee’s abilities, work load at the time of contract completion, performance and work attitude and b) the continuation
-
: Kazunari Yamada As a key component of the radio-frequency (RF) system for the Charge Stripping Ring (CSR), which will play a central role in the RIBF Upgrade Project, the successful candidate will be
-
adjust the above maximum period of renewability based on a) the employee’s abilities, work load at the time of contract completion, performance and work attitude and b) the continuation of the employee’s
-
. 2.RIKEN may adjust the above maximum period of renewability based on a) the employee’s abilities, work load at the time of contract completion, performance and work attitude and b) the continuation
-
abilities, work load at the time of contract completion, performance and work attitude and b) the continuation of the employee’s center, laboratory or project and RIKEN’s management situation and budget
-
on a) the employee’s abilities, work load at the time of contract completion, performance and work attitude and b) the continuation of the employee’s center, laboratory or project and RIKEN’s management