-
most advanced heavy-ion accelerator facility — we are dedicated to the technical development, operation, and maintenance required to provide a diverse range of high-intensity heavy-ion beams with long
-
to advance RI-beam production technologies. In this role, the candidate will also be responsible for the operation, maintenance, and further development of the existing 20-kW-class high-power primary-beam dump
-
while collaborating within and outside of RIKEN. The most important mission of RIKEN BRC is the sustained and stable operation of its resource infrastructure program. Accordingly, the successful candidate
Searches related to high performance computing
Enter an email to receive alerts for high-performance-computing positions