Sort by
Refine Your Search
-
Listed
-
Category
-
Field
-
external stakeholders, including Member State delegations, institutional partners, industry and other ESA directorates; Ensure the smooth functioning of high-level representatives’ exchanges with ESA
-
segment network infrastructure, ensuring robust, secure and high-performance connectivity across all mission-critical sites. Duties Your main tasks and responsibilities will include: serving as the business
-
engineering standards. You will use existing laboratory facilities, and potentially the ESA Space High-Performance Computer, to demonstrate appropriate technologies, and will actively search for promising
-
assigned to the Section, and resolving any conflicts concerning the utilisation of the Section’s resources. . Support management: Monitoring, measuring and reporting on performance at individual and team
-
Exploration Envelope Programme (E3P) is integrating the ESA activities in this field to ensure a single exploration process. The strategy includes three destinations where humans will work with robots to gather
-
Location ESTEC, Noordwijk, Netherlands Description Programme and Strategy Coordinator in the RNC Strategy and Coordination Office, Directorate of Resilience, Navigation and Connectivity
-
the required analysis and activities. Your tasks will include, among others, transfer and operational orbit analysis and related fields, such as trading off orbit selection, optimising low-/high-thrust
-
becoming part of mainstream space engineering, but might prove disruptive in the future. The team operates to high academic standards, publishes in peer-reviewed journals and conferences, and has built up a
-
performance evaluation of RF equipment, subsystems, components and technologies applicable to space and ground segments; providing expert technical support and consultancy to ESA projects, programmes and
-
This is a fixed-term appointment with an initial duration of 4 years. Depending upon performance and organisational needs, the appointment may be extended up to a possible maximum duration of 8