Sort by
Refine Your Search
-
Listed
-
Country
-
Employer
-
Field
-
Research Studentships (for students of a Master or Integrated Master students) - (BL139/2026-IST-ID)
Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID | Portugal | about 10 hours agoan existing combined ray-tracing optical and 1D steady-state thermal model, with a model of a photoreactor (interaction of radiation with a participating medium) to predict and optimize the system's overall
-
for the conductive state under different conditions of use will be targeted. WP4 – Functional optimization: Development of the functional optimization of the DTIS, using predictive modelling based on climate forecast
-
laboratory prototypes for predictive maintenance, and promoting and disseminating the EIC 2026 results of the DIGI2 Lab. Legislation and regulations: Law Nº. 40/2004, of 18th August, in its current wording
-
activities – software development and scientific writing – testing laboratory prototypes for predictive maintenance, and promoting and disseminating the EEC 2026 results of the DIGI2 Lab. Legislation and
-
(FEUP), under the scientific supervision of Professor Vera Maria Ferreira da Cruz Homem. Grant duration: Initial duration of 5 months, with the predicted starting date in October 2026, on an exclusive
-
seeking for a highly motivated PhD-Student (at least 30 hours/week, Master’s degree required) for the project “Predicting Recovery of Consciousness via Evidence-based Evaluation and Diagnosis” (PROCEED
-
duration: Initial duration of 5 months, with the predicted starting date in August 2026, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure
-
Vilar. Grant duration: Initial duration of 6 months, with the predicted starting date in September 2026, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not
-
Filipe Ribeiro Pinto de Oliveira Azevedo. Grant duration: Initial duration of 3 months, with the predicted starting date in September 2026, on an exclusive basis eventually renewable but never exceeding
-
months, with the predicted starting date in July 2026, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 12 months