Sort by
Refine Your Search
-
School of Informatics, Computing, and Engineering at Indiana University Bloomington invites applications for several tenure-track and tenured faculty positions to add to IU’s research leadership in
-
process can be directed to Prof. Chen-Ting Liao (Liao3[at]IU.edu) Basic Qualifications: • Ph.D. in Physics, Chemistry, Quantum Information Science, Optics, Electrical Engineering, or a related field at the
-
Biosciences and Technology Institute (CBATI)invite applications for tenured or tenure-track faculty positions, available at all levels, focused on advancing knowledge and developing innovative solutions in
-
Resident/Green Card holder, or (3) in the application process to become a U.S. Permanent Resident/Green Card holder. • Ph.D. in Physics, Chemistry, Quantum Information Science, Optics, Electrical Engineering
-
800 students annually in degree and/or certificate programs in dentistry, allied dental programs, PhD, and advanced dental specialty programs tailored to current and future needs of the professions and
-
abdomen, preferred; additional sonography registries encouraged (i.e. OB, Vascular Technology, Echocardiography, Breast Sonography, Peds Sonography); OR Holds ARRT current registration in a post-primary
-
Posting Details Position Details Title Adjunct Faculty in New Media, Art, and Technology Appointment Status Non-Tenure Track Department IU Kokomo New Media, Art, and Technology Location Kokomo
-
, Vascular Technology, Breast Sonography, Pediatric Sonography); OR Holds ARRT current registration in a post-primary sonography modality. Department Contact for Questions Carla Ewing Associate Director, HR
-
certification in Radiography, an additional certification in a Medical Imaging Modality may be required, must hold a current Indiana State Department of Health Radiologic Technologist license, hold a
-
at the intersection of health, life science, and technology to meet community needs and improve health outcomes in the State of Indiana. The creation of H2W, along with the current construction of a new 50,000 sq ft