Sort by
Refine Your Search
-
aiming to confirm the suitability of the end-to-end security risk analysis, as designed and as built, including compliance with the security framework and preparatory activities in support of the system
-
and technology programs. The Mechanisms Section (TEC-MSM) is in charge of the design, engineering and verification of space mechanisms. Space mechanisms is a very wide and challenging engineering domain
-
/Copernicus_Sentinel_Expansion_missions Field(s) of activity/research for the traineeship Together with a complex design, one of the challenges of the CIMR spacecraft engineering is the assessment of the nutation dynamics
-
accordance with the Contribution Agreement and the Programme Management Plan; conducting all relevant IPT activities, including for the build-up of EU engineering, manufacturing and supply chain capabilities
-
the ESA Security Office for security activities aiming to confirm the suitability of the end-to-end security risk analysis, as designed and as built, including compliance with the security framework and
-
exploiting different technologies (e.g. analogue, digital, optical) including design, performance analysis tools and testing; earth observation and scientific RF active and passive instruments design
-
aspects of the multi-viewing, multi-channel, multi-polarisation imager (3MI) instrument design, development, testing, performance and in-orbit activities under the MetOp-SG programme. Duties Your main tasks
-
responsible for space instrumentation and end-to-end communication systems, subsystems, and equipment and technologies, which covers the following: Telecommunication system and subsystem design and validation
-
services. ESA is the design authority of EuroQCI, a Commission-led initiative which will consist of a terrestrial segment relying on fibre communications networks linking strategic sites at national and
-
European Union Integrated Maritime Policy by extending the capacity to monitor our marine ecosystem and by increasing our maritime surveillance abilities. The project is currently in the detailed design phase