Sort by
Refine Your Search
-
programming. Experience in power systems software like PSCAD, PSS/e. Preferred Qualifications: Experience with software development. Experience with use of GPUs, multi-core CPUs, advanced computing (e.g., QPUs
-
. Department of Energy's Better Buildings, Better Plants Program. This position will operate and continuously improve the Better Plants Diagnostic Equipment Program, which provides industry partners with access
-
software development. Experience with use of DSPs, FPGAs, advanced computing (e.g., GPUs, QPUs). Excellent written and oral communication skills. Motivated self-starter with the ability to work independently
-
that span low-power edge computing utilizing spiking neural network algorithms to large models utilizing agentic AI to solve complicated problems in nuclear safeguards, warhead monitoring and fundamental
-
Requisition Id 16761 Overview: As a Senior HPC Architect at Oak Ridge National Laboratory (ORNL), you will lead the architecture, design, and evolution of high-performance computing platforms
-
success. Basic Qualifications: Ph.D. in electrical engineering, power systems, computer engineering, control engineering, or a closely related field. Strong background in power system modeling, dynamic
-
Requisition Id 16568 Overview: We’re hiring an AI Software Engineer who has AI/ML development and deployment skills! The position and its focus are to design, develop and move to production AI/ML
-
monitoring software to identify performance trends and recommend improvements. Review cooling system components — piping, pumps, water treatment — and provide engineering support for design changes per
-
procedures. Implementation and Integration: Install, configure, and integrate hardware and software components in line with system design. Implement automation scripts and tools to streamline system operations
-
the new Government Computing Facility (GCF) data center project. This role will provide electrical engineering, design oversight, field support, and technical coordination for a new data center facility