-
integration scheme builds on a CEA-LETI patent that enabled the fabrication of TaN/TiN-based superconducting interconnections, exhibiting a critical temperature (Tc) on the order of one kelvin [1]. The goal
-
Researcher will play a key role in the development and validation of the absorption injector, covering the full research cycle from physical modelling to experimental demonstration. Your main tasks will
-
of the DBSCI (imaging platforms of the LPCV, IBS, PFNC, equipped with instruments such as FIB-SEM and cryo-TEM, etc.). You will work in close collaboration with IBS to build a local network aimed at developing
Searches related to building physics
Enter an email to receive alerts for building-physics positions