Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
Experience supporting research in particle accelerators, radiation detection, pulsed power, high-voltage systems, or related engineering research is desirable Special Requirements: Physical Requirements: Must
-
theft, sabotage, unauthorized access, and other security threats. ORNL is the largest U.S. Department of Energy science and energy laboratory, conducting basic and applied research that advances U.S
-
Requisition Id 17045 Overview: Oak Ridge National Laboratory (ORNL) is the largest US Department of Energy science and energy laboratory, conducting basic and applied research to deliver
-
in the Sustainable Manufacturing Technologies Group in the Manufacturing Science Division (MSD) of the Energy Science and Technology Directorate at Oak Ridge National Laboratory (ORNL). Our research
-
simulations in fusion devices. Support coordinated multi-physics simulations of fission reactor core, fusion device blankets, and other system components. Develop reduced-order calibration approaches and apply
-
oversight of ORNL Material Balance Areas (MBA) and NMC&A activities which potentially cover all areas of NMC&A (Program Management, Material Control, Material Accounting, Physical Inventory, Nuclear Material
-
materials within the uranium fuel cycle. Research topic areas will be related to understanding the effects of material processing on chemical and physical observables and translating this understanding
-
delivery to the target. These systems typically utilize PLC, VME, or MicroTCA hardware, integrated using the Experimental Physics and Industrial Control System (EPICS) framework. This position reports
-
challenges facing the nation. The Computational Coupled Physics (CCP) Group within the Computational Sciences and Engineering Division (CSED), at Oak Ridge National Laboratory (ORNL) is seeking an R&D
-
office system and software packages (e.g., Microsoft Office Suite, SAP) are required. Ability to lift and/or position up to 50-lb phantoms, assist with detector and electronics installation, and physically