Sort by
Refine Your Search
-
for two KTP Associates, working on a joint project to develop a tool using advanced computational structural and fluid dynamics to optimise lubrication and structural performance. The tool will aid in
-
holiday package; plus the opportunity to buy more, great pension schemes and a number of health and wellbeing initiatives to support you. Closing Date: 17 June 2024 The Role The structural biology
-
Assistant/Associate in the computational structure prediction of solid-state battery materials in the Ion Transport and Interfaces Group of Dr. James A. Dawson at Newcastle University. The position is
-
& Facilities Service, we have an exciting opportunity for an experienced construction professional to join our Capital Team of Project Managers. The Capital Team are an in-house service that is responsible
-
Efficient Designed Structures (SEEDS) . The project will involve electrical and electrochemical measurements of supercapacitor energy storage devices supplied by SEEDS to evaluate key performance metrics
-
the overglycosylation of ECM collagens, reducing their stability and structural integrity. This project will use both primary and immortalised chondrocytes to determine the impact of knockout and overexpression
-
collect and analyse the data needed to increase the throughput and accuracy of force field parameterisation, and interface the developed open software packages and methods with workflows for structure-based
-
within agreed timelines, ensuring that project milestones are met to a high standard Oversee the collection, processing, and management of structured and unstructured health data, ensuring data integrity
-
of large-scale structures, in particular, weak gravitational lensing and/or intrinsic alignments. This position is full time (37 hours) and fixed term, available with an immediate start for a period of 2
-
for changing circumstances • Works in a planned and structured way • Ensures all activities are completed on time • Uses systems and tools to ensure records and audit trails are clear and up to date